The ForCES meeting at IETF 54 marked the successful completion of the last call period for the Netlink Informational draft and the ForCES Requirements draft. The Netlink draft was forwarded to the IESG and the Requirements draft will proceed to the IESG after an editorial revision is posted. Changes to the ForCES framework where discussed and the chairs noted that this document is maturing and may last call soon. An early draft individual contribution of a model document was presented and will be further refined by the authors before being submitted for consideration as a working group document.